top of page

PEC Connect

Contact: hello@pecconnect.ca 
View our:  Privacy Policy   and  Terms of USE

Join Our Community

Blog, News, and More!

Prince Edward County Blog

Are you a local interested in community news, council info, and more? Or a visitor wanting to familiarize yourself with PEC? Subscribe to stay in touch with us for more of what interests you!

© 2026 by PEC Connect Inc.

Part 1: Community Safety, Youth Programs, and Policing Updates – 09/17/2024

This meeting focused on how accessibility is being built into public spaces, municipal buildings, staff training, and community programs across the County. The tone of the meeting was practical and forward-looking, with members repeatedly emphasizing that accessibility must be planned early and not treated as an afterthought.


Video conference with a sign language interpreter, council meeting at a round table, screens with attendees, and a "The County" logo.
© PEC Council (YouTube)

Early in the meeting, the committee reviewed and approved the agenda and minutes, then moved into announcements that highlighted accessibility in community life. These included local events being made physically accessible and the promotion of inclusive cultural activities. This set the stage for a meeting that centered not only on policy but also on real lived experience.


A major portion of the meeting was dedicated to parkland dedication projects, with staff presenting three separate initiatives. The first was the Bloomfield Mill Pond Park pathway, a new AODA-compliant path designed to connect parking areas, playgrounds, conservation space, and courts.


The discussion focused heavily on surface materials, width, maintenance, passing space for mobility scooters, and whether edge protection would be required near slopes. Committee members with lived experience provided practical feedback about wheelchair use, weather impacts, and long-term maintenance.


School building with green and gray walls, labeled Athol-South Marysburgh Public School. Red accent on entrance. Overcast sky.
Photo: Athol-South Marysburgh Public School

The second parkland project involved Athol South Marysburg Public School, where limited municipal green space led to a creative solution. Rather than buying land, the municipality is working with the school board to formalize public access to the schoolyard outside school hours.


This includes signage, seating, and possible equipment upgrades, all with accessibility in mind. The project emphasized partnerships, shared use, and making existing spaces work better for everyone.


The third project was the Big Island Boat Launch, which is still in early planning stages. Public consultation had just taken place, and early ideas included seating, picnic areas, and a canoe and kayak launch that would be stable and usable by people with limited mobility.


The committee stressed the importance of accessible seating and practical launch designs that balance simplicity with safety.


Another significant topic was the Facilities Condition Assessment for municipal buildings. Staff explained that many buildings are old, pre-amalgamation, and not AODA-compliant. The County is now developing a full asset management plan, combining building condition data with accessibility needs.


This led to an important discussion about how accessibility is prioritized when buildings also require major structural work, such as foundations or mechanical systems.


Hand stacking wooden blocks labeled Diversity, Equity, Inclusion on a yellow background, conveying a message of unity and inclusion.

The committee also received updates on Diversity, Equity, and Inclusion training, including a proposal for interactive DEI action-planning sessions for council, boards, and committees. The Accessibility Advisory Committee was asked to act as the pilot group for this training, with the goal of refining it before broader rollout.



Additional updates included a nonprofit sector networking event, progress on the Access the County Task Team, and changes to working group membership to strengthen planning and site review capacity. The meeting closed with a discussion of the committee’s work plan and next steps.


Overall, the meeting reinforced that accessibility is not just about ramps and doors, but about systems, training, partnerships, and long-term planning.

Disclaimer: This article is based on a meeting with an approximate duration of 1:33:48. Due to the length of the meeting, our team was not able to independently review the full recording in its entirety. As a result, we relied on software-generated transcription, automated summarization, and automated recognition of speakers and participants, which may not be entirely accurate. All transcriptions, summaries, and related content are prepared by our team in good faith and on a reasonable best-efforts basis. The content is provided for general informational purposes only and is intended to support public understanding of the topics discussed. While reasonable efforts have been made to present the information accurately, automated processes may result in errors, omissions, or unintended misinterpretations. This article does not constitute an official, certified, or verbatim record of the meeting, and it should not be relied upon as such. Readers are encouraged to consult original source materials, official minutes, or recordings where available for confirmation or clarification. Questions, requests for clarification, or suggested corrections may be submitted to hello@pecconnect.ca for review and consideration.

Comments


bottom of page