top of page

PEC Connect

Contact: hello@pecconnect.ca 
View our:  Privacy Policy   and  Terms of USE

Join Our Community

Blog, News, and More!

Prince Edward County Blog

Are you a local interested in community news, council info, and more? Or a visitor wanting to familiarize yourself with PEC? Subscribe to stay in touch with us for more of what interests you!

© 2026 by PEC Connect Inc.

Part 1: White Chapel Heritage Concerns, Property Standards Bylaw Review, and Heritage Protection Tools - 02/05/2025

This meeting was held virtually, livestreamed, and recorded as part of the County’s formal advisory process. The agenda and previous minutes were approved without issue, and there were no declarations of pecuniary interest.


Early announcements highlighted Flashback February, a month-long series of heritage events across the county, including talks on cemeteries and local history. These announcements set the tone for a meeting focused strongly on heritage protection, stewardship, and long-term planning.


Nine people in a virtual meeting displayed in a grid. Some are speaking, others listening. Varied backgrounds with framed art. Names visible.
© PEC Council (YouTube)

White Chapel Deputation and Heritage Concerns



The central topic of the meeting was the White Chapel, a historic property near Picton that has experienced increasing physical damage over the past decade. A deputation was presented requesting stronger action following council’s earlier decision to refer the issue back to the committee.


The deputation argued that past municipal processes failed to properly consider the White Chapel during Picton Terminal planning and settlement discussions. The key request was for clear, direct action, not exploratory language, to protect the building.


Specific concerns included cracked windows, foundation deterioration, fallen headstones, and declining fundraising capacity. The committee heard that increased industrial activity and blasting nearby are believed to be contributing factors.


Heritage Impact Assessment Versus Interim Action


Much of the discussion focused on whether a Heritage Impact Assessment should be ordered immediately. While the value of an HIA was widely acknowledged, it was also recognized as costly and time-consuming.


As a result, the committee explored interim steps, including a building condition assessment and a vibration or geotechnical study. These studies would help determine whether industrial vibrations are causing structural damage and would inform any future HIA or legal action.


Property Standards Bylaw and Heritage Enforcement


The committee reviewed a draft Property Maintenance and Occupancy Standards Bylaw, with a strong focus on how it would apply to designated heritage properties. New definitions and enforcement tools were introduced, including heritage permits, heritage attributes, and administrative monetary penalties.


Committee members raised concerns about whether the bylaw had enough tools to stop damaging work in real time, especially when inappropriate construction methods are used on heritage buildings. The need for stronger stop-work authority tied to heritage protection was a major theme.


Limits of Authority and Funding Challenges


A person in a blue plaid shirt makes a time-out gesture with a concerned expression against a white background.

Several discussions highlighted the limits of municipal authority, particularly when buildings are not designated under the Ontario Heritage Act or when provincial rules restrict enforcement.


There was also a candid discussion about the financial burden on private owners of heritage buildings. While grants exist, they are small relative to today’s construction costs, raising questions about fairness and long-term sustainability.


Committee Decisions and Next Steps


By the end of the meeting, the committee agreed on two key actions. First, the White Chapel Management Board would be encouraged to apply for a heritage property grant to fund a geotechnical or vibration study. Second, the original motion about a Heritage Impact Assessment would be deferred to the March meeting, allowing time to properly scope the next steps.


Other items included approving the committee’s annual report to council, appointing a committee representative to participate in film permit reviews involving heritage properties, and receiving updates on ongoing task teams and work plans.

Disclaimer: This article is based on a meeting with an approximate duration of 1:51:56. Due to the length of the meeting, our team was not able to independently review the full recording in its entirety. As a result, we relied on software-generated transcription, automated summarization, and automated recognition of speakers and participants, which may not be entirely accurate. All transcriptions, summaries, and related content are prepared by our team in good faith and on a reasonable best-efforts basis. The content is provided for general informational purposes only and is intended to support public understanding of the topics discussed. While reasonable efforts have been made to present the information accurately, automated processes may result in errors, omissions, or unintended misinterpretations. This article does not constitute an official, certified, or verbatim record of the meeting, and it should not be relied upon as such. Readers are encouraged to consult original source materials, official minutes, or recordings where available for confirmation or clarification. Questions, requests for clarification, or suggested corrections may be submitted to hello@pecconnect.ca for review and consideration.

Comments


bottom of page